Two GE LM5000 Gas Turbine Generator Sets - 35 MW

• Two identical units, commercial operation - 1992   Unit #1 Unit #2
• Natural Gas Fuel - Cogen USA jobsite Lifetime fired hours: 53,759 53,917
• Removed from service May 2010

Fired hours since last
     hot section repair:

8,689 1,260
• Brush Air Cooled elec gen 13.8kv, 65mva capability Fired hours since last
    major shop overhaul:
9,689 12,221
• Woodward Controls      
• All equipment installed indoors ISO Heat Rate, btu/kwh lhv 9,290 9,290
       

LM5000 gensetLM5000 power plant indoor shot