GE Frame 6551B 50 Hz Combined Cycle - SOLD
|
• Gas turbine generator manufactured by Alstom in 1998 with MKV • Commercial operation- ChangZhou, China - 1999; only 8,032 lifetime fired hours • Added steam turbine generator - 2004 • Liquid fuel & black start capability • Includes drawings and documentation |
• Complete combined cycle power plant Includes HRSG, 14 MW condensing steam turbine generator, all BOP equipment, ABB DCS, step-up transformer, and switchyard
• Owner has resources to disassemble and crate, easy seaway access |


Attachment:
