GE Frame 6551B 50 Hz Combined Cycle - SOLD

 

• Gas turbine generator manufactured by Alstom in 1998 with MKV

• Commercial operation- ChangZhou, China - 1999; only 8,032 lifetime fired hours

• Added steam turbine generator - 2004

• Liquid fuel & black start capability

• Includes drawings and documentation

• Complete combined cycle power plant Includes HRSG, 14 MW condensing steam turbine generator, all BOP equipment, ABB DCS, step-up transformer, and switchyard

 

 

• Owner has resources to disassemble and crate, easy seaway access